Questions and responses 41st Parliament, 1st session June 2, 2011, to September 13, 2013

Refine your search

Search results for topic:"Scientific research and scientists"

Results 1-18 of 18

Results from historical information do not include searching within the departmental responses.
Historical information
The information shown below relates to a prior session.

Q-1096

41-1
June 2, 2011, to September 13, 2013

Q-1096

41st Parliament, 1st session
Date asked
December 4, 2012
Answered
January 28, 2013
With regard to federal research relating to water: (a) in which federally-owned facilities and departments, including the Experimental Lakes Area, is the government conducting research on water issues, including but not limited to research relating to fisheries, fish habitat, climate change, groundwater, water quality, and wastewater technology and processes; and (b) since January 1, 2006 what major water-related research projects have been or are currently being undertaken in these facilities and departments, ranked by project budget size?
Historical information
The information shown below relates to a prior session.

Q-1085

41-1
June 2, 2011, to September 13, 2013

Q-1085

41st Parliament, 1st session
Asked by
Date asked
November 29, 2012
Answered
January 28, 2013
With regard to the National Research Council (NRC) and its short-term goal for 2012 of transitioning to a program management model, as of November 30, 2012: (a) what programs have reached the final phase of the program approval process; (b) what are the names and brief descriptions of these approved programs; (c) what is the total number of research staff working on each of these approved programs; (d) what is the total number of full-time equivalent research staff working on each of these approved programs; (e) what is the total number of full-time research staff working under the NRC; (f) what is the total number of full-time equivalent research staff working under the NRC; (g) what is the number of full-time research staff whose time has not yet been completely assigned to one or more approved programs; (h) what is the explanation for any full-time research staff still waiting to get to work at a full-time equivalency on approved programs; (i) for research staff whose time is not yet completely assigned to approved programs, how is it being decided what they will work on when they are not working on approved programs, and to what internal account is their time being billed; (j) what project reports are being filed on that interim research work; (k) since April 1, 2012, what concerns has the Minister of State for Science and Technology expressed to NRC management with regard to NRC’s transition to a program management model; and (l) since April 1, 2012, what directions has the Minister of State for Science and Technology given to NRC management with regard to itss transition to a program management model?
Historical information
The information shown below relates to a prior session.

Q-1107

41-1
June 2, 2011, to September 13, 2013

Q-1107

41st Parliament, 1st session
Date asked
December 10, 2012
Answered
January 28, 2013
With regard to budget cuts at the Department of Fisheries and Oceans (DFO ) : (a) what is a detailed breakdown of the $11.5 million reduction in funding for investments in Fisheries Science Research; (b) what is a detailed breakdown of the cuts to habitat management, including (i) the total number of jobs lost, (ii) the location of the jobs lost, (iii) the titles of the jobs lost; (c) what is a detailed breakdown of the financial cuts to each DFO research centres in Canada; and (d) what is a detailed breakdown of the DFO cuts on Prince Edward Island, including (i) the total number of jobs lost, (ii) the location and job title of each job lost, (iii) what office spaces will be left vacant because of DFO cutbacks and what, if any, are the plans for the vacated office spaces?
Historical information
The information shown below relates to a prior session.

Q-1068

41-1
June 2, 2011, to September 13, 2013

Q-1068

41st Parliament, 1st session
Asked by
Date asked
November 21, 2012
Answered
January 28, 2013
With regard to the refocusing of the National Research Council (NRC) mandate: (a) what was the rationale for the refocusing on business-led, industry-relevant research; (b) what constitutes a refocusing on business-led, industry-relevant research; (c) when was the change first proposed, and by whom; (d) what consultations took place regarding this change and who was consulted; (e) what programs and employee positions will be eliminated, or be at risk of being eliminated, as a result of this change; (f) what programs and employee positions will be restructured with greater focus towards business-led, industry-relevant research; (g) how many scientific positions currently exist within the NRC and how many will exist after the restructuring; (h) what was the overhead time spent by employees at the NRC for the past five years; and (i) what funding supports will be in place for non-oriented research and development once the focusing of the mandate is complete?
Historical information
The information shown below relates to a prior session.

Q-928

41-1
June 2, 2011, to September 13, 2013

Q-928

41st Parliament, 1st session
Asked by
Date asked
September 27, 2012
Answered
November 19, 2012
With regard to research conducted at the Experimental Lakes Area (ELA): (a) why were Department of Fisheries and Oceans scientists recently awarded competitive internal grants on departmental priorities for conducting research at ELA; (b) was any analysis done on the impact on existing programs of cancelling funding on March 31, 2012, for the ELA and, if not, why not; (c) will the government conduct an analysis before cancelling the funding; and (d) what contingency plans are being made for research or projects that will not have been completed by the deadline?
Historical information
The information shown below relates to a prior session.

Q-968

41-1
June 2, 2011, to September 13, 2013

Q-968

41st Parliament, 1st session
Asked by
Date asked
October 4, 2012
Answered
November 23, 2012
With regard to Fisheries and Oceans Canada: (a) what is the total amount, in dollars, broken down by year from 2006 to 2012, allocated to the Experimental Lakes Area (ELA) by the government; (b) what is the total amount of funding, in dollars, external to core funding from the Department of Fisheries and Oceans, secured by the ELA, broken down by year from 2006 to 2012; (c) what is the projected cost of closing or “mothballing” the ELA; (d) how was the projected cost of closure of the ELA calculated; (e) what factors were considered when assessing the costs of the closure of the ELA; (f) what means, or media, for communications is Fisheries and Oceans Canada Director General Dave Gillis allowed to employ to communicate information regarding any changes in ELA funding to (i) employees of the ELA, (ii) current stakeholders, (iii) potential stakeholders, (iv) the public; and (g) what will the consequences of closing the ELA be?
Historical information
The information shown below relates to a prior session.

Q-1215

41-1
June 2, 2011, to September 13, 2013

Q-1215

41st Parliament, 1st session
Date asked
March 5, 2013
Answered
April 19, 2013
With regard to the cancellation of the Experimental Lakes Area (ELA) program and the government’s existing liability under the Memorandum of Agreement with the government of the Province of Ontario for remediation of the ELA site, in the event of a transfer of the ELA facilities to a suitable new operator: (a) has the government conducted a legal analysis of the implications of retaining or transferring its existing liability responsibilities for the ELA; (b) will the government execute a transfer of the ELA facility and research program, in accordance with its liability responsibilities; (c) will the government extend its support for the ELA, both facilities and staff, in the event that a transfer agreement is not in place by March 31, 2013; (d) will the government provide transitional office and administrative support for ELA staff; (e) will the government enable those researchers with ongoing programs to prepare for and execute their on-site research in the coming field season and, if so, how; and (f) will the government retain its liability in perpetuity and delay this expenditure or, if not, will the government gradually reduce its liability over a period of 10 to 20 years in order to facilitate a successful transfer?
Historical information
The information shown below relates to a prior session.

Q-967

41-1
June 2, 2011, to September 13, 2013

Q-967

41st Parliament, 1st session
Asked by
Date asked
October 4, 2012
Answered
November 23, 2012
With regard to the National Research Council of Canada (NRC): (a) how many Research Associates in each portfolio were employed by NRC in September 2011; (b) how many Research Associates in each portfolio were employed by NRC in September 2012; (c) broken down by portfolio, what are the numbers of NRC researchers charging their time against each research project time code, and what is the number of total hours charged against each research project time code, by month from January 2010 to the present; (d) broken down by portfolio, what are the numbers of NRC researchers charging their time against each portfolio time code, and what is the total number of hours charged against each portfolio time code, by month from January 2010 to the present; and (e) what are the job titles of all of the people who may edit or give approval for papers and articles to be submitted by NRC employees to peer-reviewed journals?
Historical information
The information shown below relates to a prior session.

Q-936

41-1
June 2, 2011, to September 13, 2013

Q-936

41st Parliament, 1st session
Date asked
October 1, 2012
Answered
November 19, 2012
With regard to the cancellation of the Experimental Lakes Area program and discontinuance of funding: (a) what initiatives or programs are being cut; (b) for each initiative or program, what are the amounts of the planned decreases in human resources and funding; (c) will positions be eliminated and, if so, how many; and (d) which initiatives or programs will be eliminated by Budget 2012?
Historical information
The information shown below relates to a prior session.

Q-937

41-1
June 2, 2011, to September 13, 2013

Q-937

41st Parliament, 1st session
Date asked
October 1, 2012
Answered
November 19, 2012
With regard to the cancellation of the Experimental Lakes Area (ELA) program and dismantling of the Experimental Lakes Area science team: (a) what assessment led to the termination of the ELA program; (b) what was the review process; (c) which departments led the review; (d) who made the decision to terminate the program and on what date; (e) does the ELA research program align with the Department of Fisheries and Oceans’ priorities and, if not, how does the ELA research program fail to align with the mandate; and (f) does the ELA research program align with the mandate of Environment Canada?
Historical information
The information shown below relates to a prior session.

Q-1149

41-1
June 2, 2011, to September 13, 2013

Q-1149

41st Parliament, 1st session
Asked by
Date asked
January 24, 2013
Answered
March 18, 2013
With regard to the emigration of skilled Canadian workers: (a) how does the government measure the emigration of Canadian workers skilled in fields related to science and technology; (b) how does the government measure the number of Canadian-educated post-graduates in fields related to science and technology that take up employment outside of Canada; (c) what programs are in place to retain Canadian-educated post-graduates in fields related to science and technology and how is the effectiveness of these programs measured and publicly reported; (d) what measures are used to support government claims that the “brain drain” in science and technology fields is being reversed; (e) what consultation has taken place within the past year with those in the science and technology communities to address concerns about emigration of skilled Canadian workers; (f) how many research labs and facilities undertaking basic research are currently receiving tri-council funding; and (g) how many facilities currently receiving tri-council funding, barring the application and approval for new sources of tri-council funding, will no longer be receiving any tri-council funding once their current term for existing grants has expired?
Historical information
The information shown below relates to a prior session.

Q-1320

41-1
June 2, 2011, to September 13, 2013

Q-1320

41st Parliament, 1st session
Asked by
Date asked
April 23, 2013
Answered
June 7, 2013
With regard to ongoing investigation into habitat conservation in Canada, and particularly the proposed National Conservation Plan: (a) what research, including all studies, findings and recommendations, and investment has the government undertaken to assess the full potential of the Species at Risk Act (SARA), in its current form, to contribute to national habitat conservation objectives; and (b) what research, including all studies, findings and recommendations, has the government undertaken to assess what will be required to ensure that the full potential of SARA to contribute to national habitat conservation objectives is realized?
Historical information
The information shown below relates to a prior session.

Q-1245

41-1
June 2, 2011, to September 13, 2013

Q-1245

41st Parliament, 1st session
Asked by
Date asked
March 20, 2013
Answered
May 3, 2013
What would it cost the government, on an annual basis, to re-establish a Federal Apiarist position at Agriculture and Agri-Food Canada to coordinate research in bee-keeping?
Historical information
The information shown below relates to a prior session.

Q-929

41-1
June 2, 2011, to September 13, 2013

Q-929

41st Parliament, 1st session
Asked by
Date asked
September 27, 2012
Answered
November 19, 2012
With regard to decommissioning or transferring operations of the Experimental Lakes Area (ELA) site: (a) has an economic analysis been done on the cost of remediation of the site upon decommissioning to meet the criteria agreed to in the Canada-Ontario Memorandum of Agreement for the ELA and, if not, why not; (b) what is the projected cost for remediation of the site; (c) what legal advice has the government sought regarding its liability for the site at decommissioning; (d) what legal advice has the government sought regarding its liability if it transfers the operation of the site to a third party; and (e) what discussions has the government had with the Province of Ontario on the options regarding decommissioning or transferring the operation to another operator?
Historical information
The information shown below relates to a prior session.

Q-952

41-1
June 2, 2011, to September 13, 2013

Q-952

41st Parliament, 1st session
Date asked
October 3, 2012
Answered
November 19, 2012
With regard to the Experimental Lakes Area (ELA): (a) has the government had any meetings or discussions with representatives of companies or organizations in the natural resources sector regarding the transfer of the ELA, and, if so, (i) who were the representatives, (ii) where did the meetings take place, (iii) when did the meetings take place; (b) what benefits, if any, does the government see in transferring the ELA to the natural resources sector; (c) how would the Canada-Ontario Memorandum of Agreement be affected in the event of (i) ELA site transfer to the private sector, (ii) site transfer to a university or consortium of universities, (iii) the shuttering or mothballing of the site, (iv) the permanent remediation of the site; (d) has the government’s moratorium on the Natural Sciences and Engineering Research Council Major Resources Support Program affected the ability of the government to transfer the site to a university or consortium of universities; (e) would any potential new operator of the ELA have to assume liability for the remediation of the ELA site, and what is the approximate projected cost of site remediation; and (f) is the research done at the ELA primarily the responsibility of the public sector or the private sector?
Historical information
The information shown below relates to a prior session.

Q-1248

41-1
June 2, 2011, to September 13, 2013

Q-1248

41st Parliament, 1st session
Asked by
Date asked
March 20, 2013
Answered
May 3, 2013
With regard to noise caused by airports: (a) what measures are in place to mitigate airport noise, (i) which statutes, regulations or documents set out these measures, (ii) which entities are responsible for enforcing these measures; (b) what measures are under consideration or planned to mitigate airport noise; (c) how much research funding has been provided for projects relating to mitigation of airport noise between 2006 and 2013 year to date, broken down by (i) year, (ii) title of project, (iii) recipient of funding, (iv) source of funding; and (d) how many noise complaints have been received relating to airport noise, broken down by (i) entity which received the complaint, including but not limited to airport authorities, NAV Canada and the Ministry of Transport, (ii) airport which was the subject of complaint, (iii) date of complaint?
Historical information
The information shown below relates to a prior session.

Q-874

41-1
June 2, 2011, to September 13, 2013

Q-874

41st Parliament, 1st session
Asked by
Date asked
September 17, 2012
Answered
November 1, 2012
With regard to the Canadian Institutes of Health Research’s Scientific Expert Working Group: (a) was the Scientific Expert Working Group aware that on December 7th, 2010, Dr. Beaudet assured the Subcommittee on Neurological Disease that “no physician will refuse to see and treat them for complications of a treatment received abroad”; (b) why did the Scientific Expert Working Group state that “media reports that have stated that Multiple Sclerosis (MS) patients who experience complications after Chronic Cerebrospinal Venous Insufficiency (CCSVI) treatment are not being seen by Canadian doctors are not justified”, (i) what patients or patient advocacy groups were interviewed, (ii) what evidence was reviewed, (iii) what action was taken; (c) which of the provincial guidelines for follow up care does the Scientific Expert Working Group support; (d) what was the action undertaken by the government to ensure that all patients receive follow-up care, including patients suffering from complications from CCSVI treatments received abroad; (e) when was the Sub-Committee of the Scientific Expert Working Group formed, (i) why was it formed, (ii) who are the members of the sub-committee, (iii) what prompted a meeting to develop criteria for a recommendation for clinical trials on June 13th, 2011; (f) why did the Scientific Expert Working Group fail to sign a declaration of conflict of interest until June 2011; (g) what specific results were available from the seven MS Society of Canada-funded studies on June 28th 2011; (h) with respect to the Scientific Expert Working Group’s consensus workshop on ultrasound imaging, (i) on what date did the meeting take place, (ii) who was in attendance, (iii) what were the agenda items, (iv) what were the key recommendations, (v) why was Dr. Sandy McDonald not included, (vi) on what items did the group come to consensus; (i) what is the budget for the Scientific Expert Working Group specifically, (i) the monies allotted for 2010-2011, (ii) 2011-2012, (iii) the monies allocated for travel, (iv) the monies allocated for accommodation, (v) why was Agreement no 1148 to be signed at the end of February 2011 for monies that were to be available for 2010-2011; (j) with respect to Agreement no 1148 to support the Scientific Expert Working Group between the CIHR and the MS Society of Canada, (i) was the agreement ever signed and, if so (i) on what date, (ii) who made the grant application for the President’s Fund and on what date, (iii) what was the grant specifically for, (iv) why is the MS Society of Canada responsible for planning, support and implementation of the Scientific Expert Working Group, (v) what action is being taken to ensure that there are no conflicts of interest; (k) how many researchers/research groups applied for the Phase 1/11 clinical trial, and from what institutions; and (l) what has caused the delay in announcing the research team which was to be named by mid-April 2012?
Historical information
The information shown below relates to a prior session.

Q-1177

41-1
June 2, 2011, to September 13, 2013

Q-1177

41st Parliament, 1st session
Asked by
Date asked
February 21, 2013
Answered
April 15, 2013
With regard to the Canadian Museum of Civilization: (a) how many employees, permanent and contractual, were assigned for the purposes of research, including but not limited to the Research Division, broken down by (i) year since 2005-2006, (ii) position, (iii) academic field (anthropology, ethnology, archeology, etc.), (iv) division; (b) for the next five years, what is the projected number of permanent employees who will be assigned to research in all museum divisions, broken down by (i) year, (ii) position, (iii) academic field (anthropology, ethnology, archeology, etc.), (iv) division; (c) how many meetings were held to discuss aspects of the change of name and mandate of the museum between museum officials and (i) the Minister of Canadian Heritage, (ii) the office of the Minister of Canadian Heritage, (iii) the Department of Canadian Heritage, (iv) museum employees; (d) since 2007-2008, broken down by year, how many informal meetings and telephone calls were held between museum officials and (i) the Minister of Canadian Heritage, (ii) the office of the Minister of Canadian Heritage (iii) the Department of Canadian Heritage; (e) what is the total number of visits to the museum made by (i) the Minister of Canadian Heritage, (ii) the office of the Minister of Canadian Heritage, (iii) the Department of Canadian Heritage; (f) for all exhibits since 2006, broken down by exhibit, what was the (i) total number of visitors, (ii) percentage of local visitors, (iii) percentage of visitors from outside Canada, (iv) total amount of revenues, (v) projected budget at the beginning of the planning stages, (vi) total expenses; (g) since 2008-2009, (i) what were the annual revenues of the museum per year, (ii) what are the projected annual revenues of the museum per year for next five years, (iii) do these projections take into account the change of name and mandate; (h) what is the projected number of visitors to the museum per year (not including the Canadian War Museum), for the next five years; (i) which groups (including but not limited to associations, professional associations, groups representing First Nations) and experts (including but not limited to historians, archeologists, academics) were consulted (i) prior to the Minister’s announcement of the change of name and mandate on October 16, 2012, and (ii) since the announcement of October 16, 2012; (j) regarding the consultations held between November 9, 2012, and January 31, 2013, (i) what were the total costs, (ii) how many members of the public (other than museum employees) attended each consultation; (k) regarding the funding of 25 million dollars that will “come from within the existing budget for Canadian Heritage”, according to an October 16, 2012 press release from the Department of Canadian Heritage, (i) from which programs of the Department of Canadian Heritage has funding been diverted towards this funding, (ii) what was the funding for these programs since 2008-2009, (iii) which programs’ funding will be restored to 2011-2012 levels following the museum investment; (l) regarding costs related to changing the name of the museum (including but not limited to changes to signage, logotypes, and rebranding), (i) what is the current earmarked budget, (ii) what are the projected total costs over the next five years; (m) what is the total cost of promotional materials (including but not limited to bookmarks, temporary signage, websites and paper materials) referring to the Canadian Museum of History or the change of name and mandate, or using such terms as “History Museum” and “Museum of History”; (n) what is the total cost of advertising by the museum, broken down by year and types of advertising, including but not limited to billboards, print, radio, television and online advertising, since 2006-2007; (o) for each occasion in which external legal services were provided to the museum in the last three years (i) which firms or individuals provided legal services, including but not limited to counsel or representation, to the museum, (ii) when, (iii) for what period of time, (iv) what was the nature of these services, (v) what was the purpose of these services, (vi) what were the total costs per occasion when these services were provided to the museum; and (p) for each project, exhibition or display created for or by the museum since 2005-2006 that were not displayed on museum premises, (i) what was the subject matter, (ii) where have these been displayed, (iii) what are the total costs for each, (iv) how many employees were assigned to each, at all stages (including but not limited to design, construction, and installation) (v) what were the starting and ending dates of work on each, (vi) what were the starting and ending dates of viewing or display?
Top of page