Journals
Consult the user guide
For assistance, please contact us
Consult the user guide
For assistance, please contact us
Add search criteria
Results: 1 - 8 of 8
2020-07-20 [p.509]
Q-453 — Mr. Epp (Chatham-Kent—Leamington) — With regard to the changes to the Canadian Surface Combatants (CSC) design and associated increase to the cost per ship and delay of the construction start time: (a) how many ships are specifically contracted for in the first phase of the contract with Irving Shipbuilding; (b) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister (Material) and the Commander of the Royal Canadian Navy (RCN); (c) what are the specific design changes being considered that are expected to increase the size, capacity, speed, and weight of the Type T26 frigate from the original United Kingdom design; (d) who proposed each change and who approved the change(s) as being essential to the operations for the RCN; (e) what is the rationale given for each design change contemplated in terms of the risks to schedule and budget; (f) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts; (g) what are the current state of operations and technical requirements for the CSC; (h) what is the schedule for each (i) design change, (ii) contract approval, (iii) independent report from third party advisors, including the schedule for draft reports; (i) what is the cost for spares for each of the CSC; and (j) what is the cost of infrastructure upgrades for the CSC fleet? — Sessional Paper No. 8555-431-453.
2020-07-20 [p.510]
Q-454 — Mr. Epp (Chatham-Kent—Leamington) — With regard to the Arctic Off-Shore Patrol Ships (AOPS): (a) what are the operational requirements established by the Canadian Coast Guard (CCG) for the two additional ships; (b) will the two AOPS for the CCG require redesign or changes, and, if so, what will be the specific changes; (c) what will be the specific cost for the changes; (d) when and in what reports did the CCG first identify the need for AOPS; (e) has the CCG identified any risks or challenges in operating the two AOPS, and, if so, what are those risks; and (f) what will be the total estimated costs of the two AOPS to CCG? — Sessional Paper No. 8555-431-454.
2020-07-20 [p.511]
Q-458 — Mr. Shields (Bow River) — With regard to the government's plans to build 16 multipurpose vessels for the Canadian Coast Guard: (a) what are the technical operational requirements for each vessel; (b) for each contract awarded in relation to the vessels, what is the (i) expected budget, (ii) schedule, (iii) vendor, (iv) work description; and (c) for each vessel, what is the (i) total number of crew expected, (ii) expected delivery date, (iii) risks to cost or budget identified in the planning for these ships? — Sessional Paper No. 8555-431-458.
2020-07-20 [p.511]
Q-459 — Mr. Shields (Bow River) — With regard to the government's profit policy relating to shipbuilding: (a) what risks has government evaluated related to guaranteed contracts for the (i) Arctic Off­Shore Patrol Ships (AOPS), (ii) Canadian Surface Combatants (CSC), (iii) Halifax class frigates, and what were the results of each evaluation; (b) what is the profit range offered to Irving Shipbuilding Inc. for its work on the (i) AOPS, (ii) CSC, (iii) Halifax class frigates; (c) what is the total profit offered for guaranteed work under the National Shipbuilding Strategy, broken down by each "cost plus" contract; and (d) what are the details of any third party review of Canada's profit policy related to the (i) AOPS, (ii) CSC? — Sessional Paper No. 8555-431-459.
2020-04-11 [p.345]
Q-280 — Mr. Kent (Thornhill) — With regard to the impact of SNC-Lavalin’s guilty plea in December 2019 on fraud charges in relation to the company’s contract to support servicing of minor warships and auxiliary vessels: (a) what impact will the guilty plea have on the scheduled renewal of the contract; (b) what specific considerations will the government take into account when deciding the status of the renewal; (c) what is the projected timeline for either renewing this contract or awarding a new contract to another company; and (d) what changes has the government made to the way it conducts business with SNC-Lavalin following the December 2019 guilty plea? — Sessional Paper No. 8555-431-280.
2020-01-27 [p.110]
Q-228 — Mr. Cooper (St. Albert—Edmonton) — With regard to the government’s plans to build 16 multi-purpose vessels of the Canadian Coast Guard: (a) what is the expected budget and schedule for the design and construction for each vessel; (b) what are details of all contracts related to (a), including (i) vendor, (ii) start date, (iii) end date, (iv) amount, (v) description of goods or services, including completion date, where applicable; (c) what is the total number of crew expected for each vessel; (d) what is the expected delivery date for each vessel; (e) what is the risk to cost or budget identified in the planning for these ships; and (f) what are the details of any reports or briefing notes prepared for or circulated by the National Shipbuilding Strategy secretariat related to these vessels in 2018 and 2019, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-228.
2020-01-27 [p.110]
Q-230 — Ms. Rood (Lambton—Kent—Middlesex) — With regard to Arctic and offshore patrol ships (AOPS): (a) will the two AOPS for the Canadian Coast Guard (CCG) require redesign or changes and, if so, what specific changes are required and what is the anticipated cost of each change; (b) what are the details of any contracts signed with Irving Shipbuilding Inc. (ISI) in relation to the AOPS, including (i) date, (ii) vendor, (iii) amount, (iv) description of goods or services, (v) file number, (vi) start and end date of contract; (c) when and in which reports did the CCG first identify the need for AOPS; (d) has the CCG identified any risks or challenges in operating the two AOPS and what are those risks; (e) what will be the total estimated costs of the two AOPS to CCG; and (f) what are the details of all briefing documents prepared on this matter, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-230.
2020-01-27 [p.111]
Q-232 — Ms. Rood (Lambton—Kent—Middlesex) — With regard to the Canadian Surface Combatant (CSC) fleet: (a) how many ships were committed in the first phase of the contract with Irving Shipbuilding Inc. (ISI); (b) what are the details of all contracts related to the CSC design, including (i) date, (ii) amount, (iii) vendor, (iv) summary of goods or services provided, (v) file number, (vi) start date and end date of contract; (c) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister of Defence (Materiel) and the Commander of the Royal Canadian Navy; (d) what are the specific design changes that are (i) being considered, (ii) being implemented, (iii) expected to increase the size, capacity, speed, and weight of the Type T26 from the original United Kingdom design; (e) who proposed each change and approved the changes in (d)(ii); (f) what was the rationale for each design change; (g) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts to the (i) Minister of National Defence, (ii) Minister of Finance, (iii) President of the Treasury Board, (iv) Privy Council Office, (v) Commander of the Royal Canadian Navy; (h) what were the technical requirements for the CSC; (i) what are the details of any reports from the independent third party advisors related to this project prepared in draft or final form in the past 12 months, including (i) date, (ii) third party advisor name, (iii) summary and findings of report; (j) what is the cost for spares for each of the CSC; (k) what is the cost of infrastructure upgrades for the CSC fleet; (l) what are the details of each contract signed between the government and ISI related to the CSC, including (i) date, (ii) vendor, (iii) amount, (iv) description of goods or services, (v) file number, (vi) start and end date of contract; and (m) what are the details of all briefing documents prepared on this matter, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-232.
Results: 1 - 8 of 8

Export As: XML CSV RSS

For more data options, please see Open Data