2020-07-20 [p.509]
Q-453 — Mr. Epp (Chatham-Kent—Leamington) — With regard to the changes to the Canadian Surface Combatants (CSC) design and associated increase to the cost per ship and delay of the construction start time: (a) how many ships are specifically contracted for in the first phase of the contract with Irving Shipbuilding; (b) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister (Material) and the Commander of the Royal Canadian Navy (RCN); (c) what are the specific design changes being considered that are expected to increase the size, capacity, speed, and weight of the Type T26 frigate from the original United Kingdom design; (d) who proposed each change and who approved the change(s) as being essential to the operations for the RCN; (e) what is the rationale given for each design change contemplated in terms of the risks to schedule and budget; (f) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts; (g) what are the current state of operations and technical requirements for the CSC; (h) what is the schedule for each (i) design change, (ii) contract approval, (iii) independent report from third party advisors, including the schedule for draft reports; (i) what is the cost for spares for each of the CSC; and (j) what is the cost of infrastructure upgrades for the CSC fleet? — Sessional Paper No. 8555-431-453.
2020-07-20 [p.510]
Q-454 — Mr. Epp (Chatham-Kent—Leamington) — With regard to the Arctic Off-Shore Patrol Ships (AOPS): (a) what are the operational requirements established by the Canadian Coast Guard (CCG) for the two additional ships; (b) will the two AOPS for the CCG require redesign or changes, and, if so, what will be the specific changes; (c) what will be the specific cost for the changes; (d) when and in what reports did the CCG first identify the need for AOPS; (e) has the CCG identified any risks or challenges in operating the two AOPS, and, if so, what are those risks; and (f) what will be the total estimated costs of the two AOPS to CCG? — Sessional Paper No. 8555-431-454.
2020-07-20 [p.511]
Q-458 — Mr. Shields (Bow River) — With regard to the government's plans to build 16 multipurpose vessels for the Canadian Coast Guard: (a) what are the technical operational requirements for each vessel; (b) for each contract awarded in relation to the vessels, what is the (i) expected budget, (ii) schedule, (iii) vendor, (iv) work description; and (c) for each vessel, what is the (i) total number of crew expected, (ii) expected delivery date, (iii) risks to cost or budget identified in the planning for these ships? — Sessional Paper No. 8555-431-458.
2020-07-20 [p.511]
Q-459 — Mr. Shields (Bow River) — With regard to the government's profit policy relating to shipbuilding: (a) what risks has government evaluated related to guaranteed contracts for the (i) Arctic Off­Shore Patrol Ships (AOPS), (ii) Canadian Surface Combatants (CSC), (iii) Halifax class frigates, and what were the results of each evaluation; (b) what is the profit range offered to Irving Shipbuilding Inc. for its work on the (i) AOPS, (ii) CSC, (iii) Halifax class frigates; (c) what is the total profit offered for guaranteed work under the National Shipbuilding Strategy, broken down by each "cost plus" contract; and (d) what are the details of any third party review of Canada's profit policy related to the (i) AOPS, (ii) CSC? — Sessional Paper No. 8555-431-459.
2020-04-11 [p.345]
Q-280 — Mr. Kent (Thornhill) — With regard to the impact of SNC-Lavalin’s guilty plea in December 2019 on fraud charges in relation to the company’s contract to support servicing of minor warships and auxiliary vessels: (a) what impact will the guilty plea have on the scheduled renewal of the contract; (b) what specific considerations will the government take into account when deciding the status of the renewal; (c) what is the projected timeline for either renewing this contract or awarding a new contract to another company; and (d) what changes has the government made to the way it conducts business with SNC-Lavalin following the December 2019 guilty plea? — Sessional Paper No. 8555-431-280.
2020-01-27 [p.110]
Q-228 — Mr. Cooper (St. Albert—Edmonton) — With regard to the government’s plans to build 16 multi-purpose vessels of the Canadian Coast Guard: (a) what is the expected budget and schedule for the design and construction for each vessel; (b) what are details of all contracts related to (a), including (i) vendor, (ii) start date, (iii) end date, (iv) amount, (v) description of goods or services, including completion date, where applicable; (c) what is the total number of crew expected for each vessel; (d) what is the expected delivery date for each vessel; (e) what is the risk to cost or budget identified in the planning for these ships; and (f) what are the details of any reports or briefing notes prepared for or circulated by the National Shipbuilding Strategy secretariat related to these vessels in 2018 and 2019, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-228.
2020-01-27 [p.110]
Q-230 — Ms. Rood (Lambton—Kent—Middlesex) — With regard to Arctic and offshore patrol ships (AOPS): (a) will the two AOPS for the Canadian Coast Guard (CCG) require redesign or changes and, if so, what specific changes are required and what is the anticipated cost of each change; (b) what are the details of any contracts signed with Irving Shipbuilding Inc. (ISI) in relation to the AOPS, including (i) date, (ii) vendor, (iii) amount, (iv) description of goods or services, (v) file number, (vi) start and end date of contract; (c) when and in which reports did the CCG first identify the need for AOPS; (d) has the CCG identified any risks or challenges in operating the two AOPS and what are those risks; (e) what will be the total estimated costs of the two AOPS to CCG; and (f) what are the details of all briefing documents prepared on this matter, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-230.
2020-01-27 [p.111]
Q-232 — Ms. Rood (Lambton—Kent—Middlesex) — With regard to the Canadian Surface Combatant (CSC) fleet: (a) how many ships were committed in the first phase of the contract with Irving Shipbuilding Inc. (ISI); (b) what are the details of all contracts related to the CSC design, including (i) date, (ii) amount, (iii) vendor, (iv) summary of goods or services provided, (v) file number, (vi) start date and end date of contract; (c) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister of Defence (Materiel) and the Commander of the Royal Canadian Navy; (d) what are the specific design changes that are (i) being considered, (ii) being implemented, (iii) expected to increase the size, capacity, speed, and weight of the Type T26 from the original United Kingdom design; (e) who proposed each change and approved the changes in (d)(ii); (f) what was the rationale for each design change; (g) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts to the (i) Minister of National Defence, (ii) Minister of Finance, (iii) President of the Treasury Board, (iv) Privy Council Office, (v) Commander of the Royal Canadian Navy; (h) what were the technical requirements for the CSC; (i) what are the details of any reports from the independent third party advisors related to this project prepared in draft or final form in the past 12 months, including (i) date, (ii) third party advisor name, (iii) summary and findings of report; (j) what is the cost for spares for each of the CSC; (k) what is the cost of infrastructure upgrades for the CSC fleet; (l) what are the details of each contract signed between the government and ISI related to the CSC, including (i) date, (ii) vendor, (iii) amount, (iv) description of goods or services, (v) file number, (vi) start and end date of contract; and (m) what are the details of all briefing documents prepared on this matter, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-232.
2018-12-03 [p.4393]
Q-1991 — Mr. Ste-Marie (Joliette) — With regard to the cancellation of the agreement signed in 2015 with the Davie Shipyard for the lease of a supply ship to enable the Royal Canadian Navy to fulfill its mission and obligations to its allies: what are the subjects and content of correspondence, including e-mails, between October 15 and December 15, 2015, (i) between the President of the Treasury Board and the owners and representatives of the Irving Shipyard in Halifax, (ii) between the President of the Treasury Board and the ministers of National Defence and Public Services and Procurement, (iii) between the ministers of National Defence and Public Services and Procurement and the owners and representatives of the Irving Shipyard in Halifax, (iv) between the President of the Treasury Board and the Office of the Prime Minister? — Sessional Paper No. 8555-421-1991.
2018-05-09 [p.3229]
Q-1603 — Mrs. Gallant (Renfrew—Nipissing—Pembroke) — With regard to the Canadian Surface Combatant (CSC) procurement and media reports that the solicitation to industry was optimized for a particular bidder: (a) is there a report from a Fairness Monitor, Auditor, or a comparable professional source, which indicates the CSC solicitation was conducted with integrity and, if so, what are the details of such reports, including (i) author, (ii) findings, (iii) date report was finalized, (iv) website location of report; (b) were any ministerial or departmental officials involved in the request for proposals approached by, or met with lobbying interests from BAE or from the Government of the United Kingdom prior to the request for proposals and, if so, what are the details including individuals involved and dates; (c) if the answer to (b) is affirmative, did any such engagement(s) influence the CSC requirements as they were solicited to industry and, if so, which ones; (d) does any of this influence referenced in (c) remain today; (e) were the planned number of ships to be procured, the quality of the product, or the projected budget altered in any manner as a result of undue influence by one of the bidders and, if so, how; (f) was the Fairness Monitor responsible for this procurement made aware of any the outside influence on the procurement process referred to in (a) through (e); and (g) what specific actions are being taken to reassure the defence industry and to dispel these suggestions of bias and bid-rigging in the media, so to ensure that there are no residual negative impacts on future major capital procurements for the Canadian Armed Forces? — Sessional Paper No. 8555-421-1603.
2018-03-19 [p.2754]
Pursuant to Standing Order 39(7), Mr. Lamoureux (Parliamentary Secretary to the Leader of the Government in the House of Commons) presented the returns to the following questions made into Orders for Return:
Q-1430 — Mr. Ste-Marie (Joliette) — With regard to the national shipbuilding procurement strategy: (a) what is the profit margin allocated by the government to Irving Shipbuilding in Halifax and Seaspan in Vancouver; (b) is there a delivery schedule that the Seaspan shipyards in Vancouver must respect; (c) if the answer to (b) is affirmative, what is the schedule, broken down by ship being built; and (d) what correspondence, including emails, was sent by the Assistant Deputy Minister of Defence and Marine Procurement at Public Services and Procurement Canada and by the Assistant Deputy Minister of Materiel at National Defence regarding the Davie shipyard and Federal Fleet Services between June 1, 2017, and December 12, 2017? — Sessional Paper No. 8555-421-1430.
2017-11-27 [p.2432]
By unanimous consent, it was resolved, — That the House deplore the loss of 800 jobs at Davie shipyards in Lévis by the end of the year.
2017-05-03 [p.1652]
Pursuant to Standing Order 39(7), Mr. Lamoureux (Parliamentary Secretary to the Leader of the Government in the House of Commons) presented the returns to the following questions made into Orders for Return:
Q-922 — Mr. Bezan (Selkirk—Interlake—Eastman) — With regard to the Canadian Surface Combatant (CSC) project: (a) how many government employees and contractors of the government have signed non-disclosure agreements or special security accountability forms, broken down by department; (b) for how many employees in (a) was signing a non-disclosure agreement or special security accountability form a condition of employment; (c) when was each non-disclosure agreement or special security accountability form signed; (d) what is the length of each non-disclosure agreement or special security accountability form signed; (e) what are the details of the prime contract awarded by the government that authorized Irving Shipbuilding to identify, select, and qualify suppliers, and to solicit, evaluate, assess, adjudicate, and request proposals from shipbuilders and contractors for the CSC project; (f) was a competition held to award the prime contract for the CSC project; (g) what evaluation process, methodology, and metrics were used in awarding the CSC prime contract; (h) what measures were used to ensure compliance with any and all legal and ethical requirements; (i) what mechanisms, procedures, rules and personnel were put in place to avoid a conflict of interest between Irving Shipbuilding, the government, and contractors; (j) have the predicted acquisition or life-cycle costs been adjusted since the June 13, 2016, announcement regarding a refined procurement process for the CSC project; (k) if the cost projections were revised, what are the new cost projections; and (l) do the cost projections in (k) account for weapons systems, munitions, and other consumables? — Sessional Paper No. 8555-421-922.
2013-03-18 [p.2866]
Q-1141 — Mr. McKay (Scarborough—Guildwood) — With regard to the National Shipbuilding Procurement Strategy: (a) what are the details of the winning bids submitted by Seaspan and Irving Shipbuilding; (b) why were the winning bids not asked to submit cost estimates for any of the vessels; (c) where did the government’s original $33 billion estimate come from and how was it calculated; (d) have cost estimates been discussed with the winning bidders subsequent to the awarding of the contracts; (e) which companies, if any, has the government contacted or been contacted by, regarding contracts relating to the winning bids; (f) does the government have any other cost estimates produced by either a government department or independent source regarding the winning bids; (g) with respect to the Seaspan bid, is $2.6 billion the only cost estimate that the government is in possession of; (h) with respect to the Irving bid, is $3.1 billion the only cost estimate that the government is in possession of; (i) with respect to the Armed Arctic Patrol vessels, what is the operational and service cost estimate for both the Arctic Patrol Ships and Replenishment ships and over what period of time; (j) has the government created an estimate of the operational and sustainment costs for a period greater than a 25 year lifespan for the vessels; (k) does the Navy currently have adequate personnel to man and operate the ships once they enter service without compromising current operational capabilities and readiness; (l) by what date does the government expect to take delivery of the first Arctic Patrol Ship and the first Replenishment Ship; and (m) by what date does the government expect to take delivery of the full fleet of both the Arctic Patrol Ships and Replenishment Ships? — Sessional Paper No. 8555-411-1141.
2013-03-18 [p.2867]
Q-1142 — Mr. McKay (Scarborough—Guildwood) — With regard to the National Shipbuilding Procurement Strategy for combat ships (destroyers and frigates, as per the Canada First Defence Strategy which states that Canada will be procuring 15 combat ships): (a) to date, what bids has the government received; (b) what is the government’s current cost estimate to procure the 15 combat ships and does the government still plan on procuring 15 of these ships; (c) is the government in possession of any other cost estimates for combat ships, other than the ones they have made public; (d) will the bidders for the combat ships be asked to submit cost estimates; and (e) what are the estimated costs for the combat ships? — Sessional Paper No. 8555-411-1142.