Journals
Consult the user guide
For assistance, please contact us
Consult the user guide
For assistance, please contact us
Add search criteria
Results: 1 - 13 of 13
2021-05-05 [p.897]
Pursuant to Standing Order 39(7), Mr. Lamoureux (Parliamentary Secretary to the President of the Queen’s Privy Council for Canada and Minister of Intergovernmental Affairs and to the Leader of the Government in the House of Commons) presented the returns to the following questions made into orders for return:
Q-555 — Mrs. Gallant (Renfrew—Nipissing—Pembroke) — With regard to the Canadian Coast Guard fleet renewal and the National Shipbuilding Strategy (NSS): (a) what is the list of each vessel, including the (i) name, (ii) region, (iii) home port, (iv) area of operations, i.e. north or south or both, (v) year commissioned, (vi) notional operational life, (vii) current age, (viii) percentage of operational notional life, as of 2021, (ix) planned end of service life (EOSL), (x) age at the end of EOSL, (xi) percentage of notional operational life at EOSL, (xii) confirm whether funding has been provided for a replacement or not, (xiii) how much funding has been provided or allocated, including taxes and contingencies for each vessel replacement, (xiv) date funding provided, (xv) date on which a replacement vessel is expected to be (A) designed, (B) constructed, (C) commissioned; (b) what are all the reasons why the polar icebreaker was removed from the Seaspan’s umbrella agreement in 2019 and substituted by 16 multi-purpose vessels; (c) what are all the risks identified with building a polar icebreaker at the Vancouver Shipyards; (d) what are the proposed scope, the schedule and the draft or anticipated budget for the replacement of the CCGS Louis S. St-Laurent and the CCGS Terry Fox polar icebreaker; (e) what is the summary of risks, including the (i) scope, (ii) budget, (iii) schedule, related to building the offshore oceanographic science vessel and the multi-purpose vessels; and (f) what are the anticipated benefits for the Royal Canadian Navy and Canadian Coast Guard of adding a third shipyard to the NSS? — Sessional Paper No. 8555-432-555.
2021-05-05 [p.897]
Q-556 — Mrs. Gallant (Renfrew—Nipissing—Pembroke) — With regard to the National Shipbuilding Strategy (NSS): (a) what is the full budget for the Canadian Surface Combatants (CSC), including (i) design, (ii) construction, (iii) licences, including intellectual property (IP) licences, (iv) spares, (v) taxes, (vi) contingencies, (vii) any specific infrastructure required for building the CSC in Halifax and all associated costs and considerations; (b) what is the total expected cost or value of the Industrial and Technological Benefits (ITB) Policies on each vessel built under the NSS, including an explanation of how these costs are calculated and how the ITB costs are validated; (c) what is the list of estimated costs that the ITB policies is adding to each vessel under the NSS, and the summary of any discussion had at the NSS Secretariat, Privy Council Office or at the deputy minister level regarding costs of the ITB policies as it relates to NSS; (d) what is the summary of any analysis conducted on the ITB policies, and a comparison in relation to any similar policy existing in the United Kingdom or in the United States frigate programs; and (e) what is the full costing of the first Arctic and offshore patrol ship, including the cost of (i) design, (ii) IP licences; (iii) construction, (iv) commissioning, (v) taxes, (vi) profit, (vii) contingencies? — Sessional Paper No. 8555-432-556.
2021-04-12 [p.738]
Q-408 — Mr. Blaney (Bellechasse—Les Etchemins—Lévis) — With regard to the National Shipbuilding Strategy and the Umbrella Agreement: (a) what are the total amount of contracts awarded or committed to (i) Seaspan, (ii) Irving Shipbuilding, (iii) Chantier Davie Canada Inc.; (b) what is the total backstop committed to each shipyard in (a); (c) what are the conditions which must be met to utilize the backstop provision under the umbrella agreement; (d) how many vessels are committed to each shipyard under their umbrella agreement and what are those vessels; (e) for each of the following programs, the AOPS program, the Off-shore Oceanographic Science Vessel, the Off-Shore Science Fisheries Vessels, the Canadian Surface Combatants, the Polar Icebreaker, the Program Icebreakers, and the Medium Patrol Vessels, what are the (i) projected costs (including taxes), (ii) expected delivery dates, (iii) costs for engineering and design, (iv) risks as identified by third party advisors around costs, budget and schedule; (f) what is the total number of AORs required to service a fleet of 15 surface combatants and the planned rotation schedule for each; and (g) on what date will the JSS 1 and JSS 2 (i) achieve full operational capacity, (ii) be outfitted or finished, and are there mitigating plans to provide resupply to the Royal Canadian Navy should these vessels not achieve Full Operational Capacity on the dates expected? — Sessional Paper No. 8555-432-408.
2021-04-12 [p.747]
Q-449 — Mr. Shipley (Barrie—Springwater—Oro-Medonte) — With regard to the multipurpose vessels (MPVs) announced by the Prime Minister in May 2019 for the Canadian Coast Guard: (a) what is the approximate cost of each vessel, as well as the total cost of the program; (b) what are the details of all contracts issued to date related to MPVs, including the (i) amount, (ii) vendor, (iii) date of the contract, (iv) date of amendment, if applicable, (v) description of goods or services; (c) what are the costs related to the management of the MPV program, broken down by department, supplier and year; (d) what are total costs or projected costs related to the design of the MPVs, broken down by year between 2019 and 2029; (e) what are the details of the competitive process for the selection of a design for the MPVs, including the (i) number of invited bidders or potential bidders for the design work, (ii) names of invited or potential bidders with whom the government or the builder have had discussions, (iii) expected timeline for a decision on the designer for the MPVs or the name of the selected designer, (iv) date the contract was entered into for the design of the MPVs, (v) requirements for the vessels, (vi) summary of the technical statement of requirements, (vii) deadline to complete design; (f) what is the expected timeline for the delivery of vessels 1 to 16, broken down by year; (g) what is the location where each vessel (1 to 16) will be (i) constructed, (ii) launched, (iii) outfitted, (iv) at the date when it reaches initial operational capability, (v) at the date when it reaches fully operational capability; (h) what are the anticipated or projected savings, per vessel, as the builder moves from ship 1 through to ship 16; (i) what considerations, if any, were given to a fixed price build contract; (j) what incentives were offered to encourage on time and on budget delivery of the vessels; (k) what risks were identified in the program during the (i) preliminary design, (ii) basic design, (iii) construction, (iv) delivery; and (l) what specific measures were taken to mitigate each risk in (k)? — Sessional Paper No. 8555-432-449.
2021-01-25 [p.452]
Q-319 — Mr. Blaney (Bellechasse—Les Etchemins—Lévis) — With regard to the National Shipbuilding Strategy since 2011: how much money has been invested by the federal government per year and per project at (i) Seaspan, (ii) Davie, (iii) Irving? — Sessional Paper No. 8555-432-319.
2020-07-20 [p.509]
Q-453 — Mr. Epp (Chatham-Kent—Leamington) — With regard to the changes to the Canadian Surface Combatants (CSC) design and associated increase to the cost per ship and delay of the construction start time: (a) how many ships are specifically contracted for in the first phase of the contract with Irving Shipbuilding; (b) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister (Material) and the Commander of the Royal Canadian Navy (RCN); (c) what are the specific design changes being considered that are expected to increase the size, capacity, speed, and weight of the Type T26 frigate from the original United Kingdom design; (d) who proposed each change and who approved the change(s) as being essential to the operations for the RCN; (e) what is the rationale given for each design change contemplated in terms of the risks to schedule and budget; (f) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts; (g) what are the current state of operations and technical requirements for the CSC; (h) what is the schedule for each (i) design change, (ii) contract approval, (iii) independent report from third party advisors, including the schedule for draft reports; (i) what is the cost for spares for each of the CSC; and (j) what is the cost of infrastructure upgrades for the CSC fleet? — Sessional Paper No. 8555-431-453.
2020-07-20 [p.510]
Q-454 — Mr. Epp (Chatham-Kent—Leamington) — With regard to the Arctic Off-Shore Patrol Ships (AOPS): (a) what are the operational requirements established by the Canadian Coast Guard (CCG) for the two additional ships; (b) will the two AOPS for the CCG require redesign or changes, and, if so, what will be the specific changes; (c) what will be the specific cost for the changes; (d) when and in what reports did the CCG first identify the need for AOPS; (e) has the CCG identified any risks or challenges in operating the two AOPS, and, if so, what are those risks; and (f) what will be the total estimated costs of the two AOPS to CCG? — Sessional Paper No. 8555-431-454.
2020-07-20 [p.511]
Q-458 — Mr. Shields (Bow River) — With regard to the government's plans to build 16 multipurpose vessels for the Canadian Coast Guard: (a) what are the technical operational requirements for each vessel; (b) for each contract awarded in relation to the vessels, what is the (i) expected budget, (ii) schedule, (iii) vendor, (iv) work description; and (c) for each vessel, what is the (i) total number of crew expected, (ii) expected delivery date, (iii) risks to cost or budget identified in the planning for these ships? — Sessional Paper No. 8555-431-458.
2020-07-20 [p.511]
Q-459 — Mr. Shields (Bow River) — With regard to the government's profit policy relating to shipbuilding: (a) what risks has government evaluated related to guaranteed contracts for the (i) Arctic Off­Shore Patrol Ships (AOPS), (ii) Canadian Surface Combatants (CSC), (iii) Halifax class frigates, and what were the results of each evaluation; (b) what is the profit range offered to Irving Shipbuilding Inc. for its work on the (i) AOPS, (ii) CSC, (iii) Halifax class frigates; (c) what is the total profit offered for guaranteed work under the National Shipbuilding Strategy, broken down by each "cost plus" contract; and (d) what are the details of any third party review of Canada's profit policy related to the (i) AOPS, (ii) CSC? — Sessional Paper No. 8555-431-459.
2020-04-11 [p.345]
Q-280 — Mr. Kent (Thornhill) — With regard to the impact of SNC-Lavalin’s guilty plea in December 2019 on fraud charges in relation to the company’s contract to support servicing of minor warships and auxiliary vessels: (a) what impact will the guilty plea have on the scheduled renewal of the contract; (b) what specific considerations will the government take into account when deciding the status of the renewal; (c) what is the projected timeline for either renewing this contract or awarding a new contract to another company; and (d) what changes has the government made to the way it conducts business with SNC-Lavalin following the December 2019 guilty plea? — Sessional Paper No. 8555-431-280.
2020-01-27 [p.110]
Q-228 — Mr. Cooper (St. Albert—Edmonton) — With regard to the government’s plans to build 16 multi-purpose vessels of the Canadian Coast Guard: (a) what is the expected budget and schedule for the design and construction for each vessel; (b) what are details of all contracts related to (a), including (i) vendor, (ii) start date, (iii) end date, (iv) amount, (v) description of goods or services, including completion date, where applicable; (c) what is the total number of crew expected for each vessel; (d) what is the expected delivery date for each vessel; (e) what is the risk to cost or budget identified in the planning for these ships; and (f) what are the details of any reports or briefing notes prepared for or circulated by the National Shipbuilding Strategy secretariat related to these vessels in 2018 and 2019, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-228.
2020-01-27 [p.110]
Q-230 — Ms. Rood (Lambton—Kent—Middlesex) — With regard to Arctic and offshore patrol ships (AOPS): (a) will the two AOPS for the Canadian Coast Guard (CCG) require redesign or changes and, if so, what specific changes are required and what is the anticipated cost of each change; (b) what are the details of any contracts signed with Irving Shipbuilding Inc. (ISI) in relation to the AOPS, including (i) date, (ii) vendor, (iii) amount, (iv) description of goods or services, (v) file number, (vi) start and end date of contract; (c) when and in which reports did the CCG first identify the need for AOPS; (d) has the CCG identified any risks or challenges in operating the two AOPS and what are those risks; (e) what will be the total estimated costs of the two AOPS to CCG; and (f) what are the details of all briefing documents prepared on this matter, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-230.
2020-01-27 [p.111]
Q-232 — Ms. Rood (Lambton—Kent—Middlesex) — With regard to the Canadian Surface Combatant (CSC) fleet: (a) how many ships were committed in the first phase of the contract with Irving Shipbuilding Inc. (ISI); (b) what are the details of all contracts related to the CSC design, including (i) date, (ii) amount, (iii) vendor, (iv) summary of goods or services provided, (v) file number, (vi) start date and end date of contract; (c) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister of Defence (Materiel) and the Commander of the Royal Canadian Navy; (d) what are the specific design changes that are (i) being considered, (ii) being implemented, (iii) expected to increase the size, capacity, speed, and weight of the Type T26 from the original United Kingdom design; (e) who proposed each change and approved the changes in (d)(ii); (f) what was the rationale for each design change; (g) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts to the (i) Minister of National Defence, (ii) Minister of Finance, (iii) President of the Treasury Board, (iv) Privy Council Office, (v) Commander of the Royal Canadian Navy; (h) what were the technical requirements for the CSC; (i) what are the details of any reports from the independent third party advisors related to this project prepared in draft or final form in the past 12 months, including (i) date, (ii) third party advisor name, (iii) summary and findings of report; (j) what is the cost for spares for each of the CSC; (k) what is the cost of infrastructure upgrades for the CSC fleet; (l) what are the details of each contract signed between the government and ISI related to the CSC, including (i) date, (ii) vendor, (iii) amount, (iv) description of goods or services, (v) file number, (vi) start and end date of contract; and (m) what are the details of all briefing documents prepared on this matter, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-232.
Results: 1 - 13 of 13

Export As: XML CSV RSS

For more data options, please see Open Data