Journals
Consult the user guide
For assistance, please contact us
Consult the user guide
For assistance, please contact us
Add search criteria
Results: 1 - 4 of 4
2021-05-05 [p.897]
Q-556 — Mrs. Gallant (Renfrew—Nipissing—Pembroke) — With regard to the National Shipbuilding Strategy (NSS): (a) what is the full budget for the Canadian Surface Combatants (CSC), including (i) design, (ii) construction, (iii) licences, including intellectual property (IP) licences, (iv) spares, (v) taxes, (vi) contingencies, (vii) any specific infrastructure required for building the CSC in Halifax and all associated costs and considerations; (b) what is the total expected cost or value of the Industrial and Technological Benefits (ITB) Policies on each vessel built under the NSS, including an explanation of how these costs are calculated and how the ITB costs are validated; (c) what is the list of estimated costs that the ITB policies is adding to each vessel under the NSS, and the summary of any discussion had at the NSS Secretariat, Privy Council Office or at the deputy minister level regarding costs of the ITB policies as it relates to NSS; (d) what is the summary of any analysis conducted on the ITB policies, and a comparison in relation to any similar policy existing in the United Kingdom or in the United States frigate programs; and (e) what is the full costing of the first Arctic and offshore patrol ship, including the cost of (i) design, (ii) IP licences; (iii) construction, (iv) commissioning, (v) taxes, (vi) profit, (vii) contingencies? — Sessional Paper No. 8555-432-556.
2021-03-22 [p.662]
Pursuant to Standing Order 39(7), Mr. Lamoureux (Parliamentary Secretary to the President of the Queen’s Privy Council for Canada and Minister of Intergovernmental Affairs and to the Leader of the Government in the House of Commons) presented the returns to the following questions made into orders for return:
Q-363 — Mr. Garrison (Esquimalt—Saanich—Sooke) — With regard to the Royal Canadian Navy’s frigate replacement program and the National Shipbuilding Strategy: (a) how critical is progress on the modernization of the Royal Canadian Navy to the defence of Canada and its allies; (b) what is the status of the Canadian Surface Combatant procurement project, including the (i) timelines, (ii) costs, (iii) target dates for the Royal Canadian Navy to take delivery of the frigates; (c) has the government conducted an inquiry in regards to the management, costs and associated production delays of the Canadian Surface Combatant procurement project and, if not, will the government commit to holding such an inquiry and make the results public; (d) what measures are being taken by the government to make sure that the National Shipbuilding Strategy remains on track to provide Canada’s armed forces personnel with the equipment they need to do their work in a timely and cost-effective manner; and (e) has the government considered appointing a single minister responsible for defence procurement, similar to our allies in the United Kingdom and Australia, in order to streamline military procurement and to provide better accountability to the public and, if not, will the government commit to establishing such a position? — Sessional Paper No. 8555-432-363.
2020-07-20 [p.509]
Q-453 — Mr. Epp (Chatham-Kent—Leamington) — With regard to the changes to the Canadian Surface Combatants (CSC) design and associated increase to the cost per ship and delay of the construction start time: (a) how many ships are specifically contracted for in the first phase of the contract with Irving Shipbuilding; (b) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister (Material) and the Commander of the Royal Canadian Navy (RCN); (c) what are the specific design changes being considered that are expected to increase the size, capacity, speed, and weight of the Type T26 frigate from the original United Kingdom design; (d) who proposed each change and who approved the change(s) as being essential to the operations for the RCN; (e) what is the rationale given for each design change contemplated in terms of the risks to schedule and budget; (f) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts; (g) what are the current state of operations and technical requirements for the CSC; (h) what is the schedule for each (i) design change, (ii) contract approval, (iii) independent report from third party advisors, including the schedule for draft reports; (i) what is the cost for spares for each of the CSC; and (j) what is the cost of infrastructure upgrades for the CSC fleet? — Sessional Paper No. 8555-431-453.
2020-01-27 [p.111]
Q-232 — Ms. Rood (Lambton—Kent—Middlesex) — With regard to the Canadian Surface Combatant (CSC) fleet: (a) how many ships were committed in the first phase of the contract with Irving Shipbuilding Inc. (ISI); (b) what are the details of all contracts related to the CSC design, including (i) date, (ii) amount, (iii) vendor, (iv) summary of goods or services provided, (v) file number, (vi) start date and end date of contract; (c) what is the most recent cost estimate for the first three ships as provided to the Assistant Deputy Minister of Defence (Materiel) and the Commander of the Royal Canadian Navy; (d) what are the specific design changes that are (i) being considered, (ii) being implemented, (iii) expected to increase the size, capacity, speed, and weight of the Type T26 from the original United Kingdom design; (e) who proposed each change and approved the changes in (d)(ii); (f) what was the rationale for each design change; (g) what, if any, are the specific concerns or issues related to costs, speed, size, weight and crewing of the T26 frigate design that have been identified by the Department of National Defence, third party advisors and any technical experts to the (i) Minister of National Defence, (ii) Minister of Finance, (iii) President of the Treasury Board, (iv) Privy Council Office, (v) Commander of the Royal Canadian Navy; (h) what were the technical requirements for the CSC; (i) what are the details of any reports from the independent third party advisors related to this project prepared in draft or final form in the past 12 months, including (i) date, (ii) third party advisor name, (iii) summary and findings of report; (j) what is the cost for spares for each of the CSC; (k) what is the cost of infrastructure upgrades for the CSC fleet; (l) what are the details of each contract signed between the government and ISI related to the CSC, including (i) date, (ii) vendor, (iii) amount, (iv) description of goods or services, (v) file number, (vi) start and end date of contract; and (m) what are the details of all briefing documents prepared on this matter, including (i) date, (ii) sender, (iii) recipient, (iv) title or subject matter, (v) summary of contents, (vi) file number? — Sessional Paper No. 8555-431-232.
Results: 1 - 4 of 4

Export As: XML CSV RSS

For more data options, please see Open Data