Thank you, Mr. Wright.
If that is the very rough estimate of the figure for the auxiliary costs of building the tunnels, which you mentioned a little bit earlier, can you give us a very rough estimate of the figure for reconfiguring the designs of each of the buildings, applying loading docks for each of those buildings, and then applying the operational cost of no longer having a centralized material management but rather going back to a 20th century kind of thing of each building having its own material supply? Is that in the tens of millions of dollars? Is that $100 million? What would that cost be?
Result: 1 - 1 of 1

Show both languages
Refine Your Search
Discussed Topic
No match found
0
Procedural Term
No match found
0
Person Speaking
No match found
0
Export As: XML CSV RSS

For more data options, please see Open Data